Meta — Odense campus
Denmark · Operational (expansion frozen)
| Status | Operational (expansion frozen) |
|---|---|
| Kapasitet (MW) | 730 reported by tracker — UNVERIFIED; likely grid/substation capacity not IT load Kilder: www.mordorintelligence.com · www.datacentermap.com |
| Kraftkilde (påstand) | Wind PPAs; waste heat to Odense district heating (operator claims) Kilder: datacenters.atmeta.com |
| Publisert PUE | UNVERIFIED at site level |
| Eierskap / jurisdiksjon | Meta Platforms, USA (self-build) Kilder: datacenters.atmeta.com |
| AI/GPU-relevans | Expansion reportedly frozen to divert capital to AI-optimized GPU sites elsewhere — i.e., NOT an AI buildout site (claim UNVERIFIED) Kilder: www.mordorintelligence.com |
| Verifikasjonsnotater | 730 MW figure needs methodology check |