Meta — Luleå campus (3 buildings)
Sweden · Operational
| Status | Operational |
|---|---|
| Kapasitet (MW) | 723.8 (third-party tracker figure — UNVERIFIED; may reflect total site power not IT load) Kilder: dgtlinfra.com · www.datacentermap.com |
| Kraftkilde (påstand) | 100% renewable (hydro-rich Luleå grid) — operator claim Kilder: datacenters.atmeta.com |
| Publisert PUE | UNVERIFIED at site level (Meta publishes fleet-wide PUE) |
| Eierskap / jurisdiksjon | Meta Platforms, USA (self-build, sole tenant) Kilder: datacenters.atmeta.com |
| AI/GPU-relevans | Hyperscale own-use; AI training capacity at site UNVERIFIED |
| Verifikasjonsnotater | 723.8 MW figure needs methodology check — likely grid connection capacity |
Felt merket UVERIFISERT kunne ikke bekreftes mot en offentlig kilde. Vi publiserer usikre data som usikre. Datafeltene vises på engelsk (kildespråket).