Borealis Data Center — Blönduós campus
Iceland · Operational
| Status | Operational |
|---|---|
| Kapasitet (MW) | ~37 reported at opening + 12 MW HPC building added 2022 (figures UNVERIFIED, conflict-prone) Kilder: baxtel.com · bdc.is |
| Kraftkilde (påstand) | 100% renewable (geothermal/hydro); Arctic free cooling (operator claims) Kilder: bdc.is |
| Publisert PUE | UVERIFISERT |
| Eierskap / jurisdiksjon | Majority: Vauban Infrastructure Partners, France (since Jul 2021); Icelandic origins; earlier Etix Everywhere stake Kilder: baxtel.com |
| AI/GPU-relevans | HPC-dedicated building; markets AI infrastructure positioning Kilder: www.datacenterdynamics.com |
| Verifikasjonsnotater | MW breakdown across sources inconsistent — verify with operator |
Felt merket UVERIFISERT kunne ikke bekreftes mot en offentlig kilde. Vi publiserer usikre data som usikre. Datafeltene vises på engelsk (kildespråket).